Consumer unit upgrades
Consumer Unit Upgrade Electrician in Wallsend
Old fuse box, or separate storage heater and domestic boards? We replace them with one modern consumer unit with every circuit protected and labelled.
RCBOs protect each circuit on its own, so one fault does not take out the whole house.
We test every circuit first, then label every way on the new board.
Time for a new board if
- It still has fuse wire
- There is no RCD, or one for everything
- You have separate storage heater boards
- It buzzes or shows scorch marks
- Nothing is labelled
- You are adding a charger or extension
How it works
- Test
Circuits and earthing.
- Fit
Metal board, labelled.
- Certify
Notified under Part P.
Fuse boards in Wallsend
Many Wallsend flats and terraces still have an early board, or two boards side by side from the storage heater days. Replacing them with one RCBO board is one of our most common jobs.
Questions
How long?
Usually a day.
Metal?
Yes, since 2016.
Paperwork?
Installation and Building Regulations certificates.